PMP Exam Set D – Q15

Which of these statements is true?

A. The cost of correcting mistakes through an inspection is much lesser than the cost of preventing them.
B. The cost of preventing mistakes is generally much lesser than the cost of correcting them as revealed by inspection.
C. It does not matter where a defect is captured as long as the finished work product does not have a defect.
D. The cost of correcting mistakes through an inspection is more or less same as the cost of preventing them since the same effort goes into both activities.

B. The cost of preventing mistakes is generally much lesser than the cost of correcting them as revealed by inspection.