PMP Exam Set F – Q89

A cost, time, quality, technical or resource value is used as a parameter and included in product specifications. Crossing this value triggers some action such as an exception report. This value would be called:

A. A turning-point
B. A threshold
C. An exception-point
D. A trigger

B. A threshold